Server Update

Preparing for the new server has been taking up a lot of my time, telling clients about it and also making sure everything is tidy before we move stuff over. The plan, after everything is locked down, is to move all the accounts over (shouldn’t take more than about two hours) then point the DNS records on the old server to point to the new, and in the meanwhile the nameserver IP addresses will be rolling over to the new server, and we should be able to take down the old server by mid next week, after making double sure nothing got lost in the shuffle.

SHARE YOUR THOUGHTS